Concrete Bureau
Free BIM Model Audit: An Independent Review of Your Revit Model
BIM/VDC Consulting

Free BIM Model Audit: An Independent Review of Your Revit Model

Maksym Reva · Co-founder, Chief Technology Officer

We recently ran a BIM training session for the architecture firm Zelemin. The lectures were useful, but the part that their architects got the most from was not the teaching. It was the audit. We went through their real projects in detail, and the review surfaced weak spots in the models that they were able to fix straight away.

That is where this offer came from. If a proper audit was the most valuable thing we gave one team, it is worth making available to others.

What the audit iS

The audit is an independent technical review of your BIM project in Revit. It is a fresh, outside look at the model that surfaces errors, breaches of standards, and the kind of risks that tend to stay hidden until they cause a problem later on.

Once you fill in a short form, we get in touch to confirm the details, then deliver a full report in PDF along with an analytical Power BI dashboard. The findings are clearly documented and easy to explore, rather than buried in a list of comments.

What we check

  • General compliance with your requirements
  • Coordination and geometric accuracy
  • Model organisation
  • Model structure
  • Model cleanliness and performance
  • Additional parameters and data

Who it is for

  • You are not sure about the quality of a model a contractor delivered
  • You are about to hand a model over and want to catch mistakes first
  • You need a fast, focused second opinion
  • You are rolling out BIM in your company
  • You want to build internal standards from a real project
  • You would rather not tie up your own team with model reviews

Why is it worth doing

A day spent on an audit now can save weeks of rework later. A model that looks finished can still carry standards breaches, coordination errors, or structural habits that only turn expensive once the project moves forward or the model changes hands.

An outside review catches those early, while they are still cheap to fix, and it does it without pulling your own people off their work to do the checking.

If you want a clear read on where a model stands, fill in the form, and we will take care of the rest.

Common questions

What is a BIM model audit?
An independent technical review of your BIM project in Revit: a fresh, outside look at the model that surfaces errors, breaches of standards, and the kind of risks that tend to stay hidden until they cause a problem later.
What do you check?
General compliance with your requirements, coordination and geometric accuracy, model organisation, model structure, model cleanliness and performance, and additional parameters and data.
What do I receive at the end?
A full report in PDF along with an analytical Power BI dashboard. The findings are clearly documented and easy to explore, rather than buried in a list of comments.
Who is an audit for?
Anyone unsure about the quality of a model a contractor delivered, about to hand a model over and wanting to catch mistakes first, needing a fast second opinion, rolling out BIM in their company, building internal standards from a real project, or who would rather not tie up their own team with model reviews.

Working on something similar?

Tell us about your project and share your data. You’ll get a fixed price and a delivery date back within one working day.

Prefer to talk it through first?Schedule a meeting

Related service

More articles